BILL OF MATERIAL

  • 1
  • Question
  • Updated 3 months ago
  • Answered
Hello,
I am using Reckon Accounts Premier Edition 2018 and want to create a Bill of Material with the idea of creating an assembly build.  We hire infrastructure for events.  I want to create a build assembly that has all the components used to build a marquee.  Does anyone know how I can do this please.
Cheers

Kieran
Photo of Kieran

Kieran

  • 254 Points 250 badge 2x thumb

Posted 3 months ago

  • 1
Photo of Graham Boast

Graham Boast, Accredited Partner

  • 10,260 Points 10k badge 2x thumb
Hi Kieran,

This can be done using Inventory Assembly items.  The real trick is to incorporate significant non-inventory costs (eg labour) into the process, but it really is a little too complex for a forum post.

Give me a call and I'd be happy to run you through what is involved in getting this happening.

Graham Boast 0409317366
Reckon Accredited Consultant
graham@reckonhelp.com.au