How to enter time and cost against an internal job

Options
Andrew Stansbie
Andrew Stansbie Member Posts: 1
edited July 2020 in Accounts Hosted
Hi All

I am using Reckon accounts hosted, Is there a way to record Time, Cost, Items against an internal job?
For example if we are producing materials at our quarry and want to track the time of employees and equipment used to produce the material. And then be able to record the income from the sales of the material back against the job to produce a profitability report.

Comments

  • Sheryl Nathan Mitchell
    Sheryl Nathan Mitchell Member Posts: 9
    edited July 2020
    Options
    We created a customer "XY" and create internal jobs under it. Use a job number as you would an external job and allocate costs accordingly.